Ventura County ADU Guide

Oxnard

The City requires a planning review step before plan check: confirm setbacks and square footage with the Planning Division, then submit through the City's online permit portal.

Official source verified 2026-08-16Official jurisdiction resource ↗
01 / Plan path

Choose the right production starting point.

The City requires a planning review step before plan check: confirm setbacks and square footage with the Planning Division, then submit through the City's online permit portal.

Express PlanStarting at $4,500

For a qualifying jurisdiction preapproved plan adapted into the property-specific architectural production set.

Custom PlanStarting at $6,500

For an original floor plan and architectural production set developed around the property and homeowner.

02 / Size + fee checkpoints

Size affects more than floor area.

The City updated its ADU ordinance in January 2026 to reflect state law changes through 2025. JADUs are 500 square feet or less within the footprint of a single-family home, and may be converted from existing square footage including an attached garage.

Fees require confirmation with Community Development. Building permit applications are submitted through permits.oxnard.org.
500 SFConfirm school-fee assessment rules750 SFState impact-fee protection checkpoint1,000 SFTwo-bedroom state minimum allowance1,200 SFCommon local upper-range checkpoint
03 / Site conditions

Property conditions can change the path.

  • Planning Division setback and floor-area confirmation
  • Zoning and lot configuration
  • Coastal Zone status for properties near the shoreline
  • Flood and drainage conditions
  • Fire access and utility service
04 / Consultant screen

Likely disciplines to evaluate.

  • Structural engineering
  • Title 24 energy documentation
  • Survey where boundaries require it
  • Coastal, civil or geotechnical consultation when triggered

Consultants are retained only when required by the property, design, or reviewing agency. Their proposals and coordination are separate from the architectural production fee unless stated otherwise in the agreement.

05 / Property-specific next step

Turn the guide into a preliminary project report.

Enter the address to screen jurisdiction, mapped constraints, likely agencies, drawing requirements, consultants, and the preliminary fee path.

Check the property →Email Bennett Design Studio →
Important: This guide is general planning information, not a zoning determination, permit approval, fee quote, or guarantee of feasibility. Current parcel records, adopted codes, agency interpretations, utility requirements, site investigation, and written agency confirmation control.