01 / Plan pathChoose the right production starting point.
ADU and JADU permits are decided by the Community Development Director. The City reports a 60-day review period once an application is deemed complete.
Express PlanStarting at $4,500For a qualifying jurisdiction preapproved plan adapted into the property-specific architectural production set.
Custom PlanStarting at $6,500For an original floor plan and architectural production set developed around the property and homeowner.
02 / Size + fee checkpointsSize affects more than floor area.
Coronado's Planning and Zoning Division administers the General Plan, Local Coastal Program and zoning ordinance together, so ADU standards are read alongside the Local Coastal Program.
Fees require confirmation with Community Development. The City publishes an ADU application handout that lists current submittal requirements.
500 SFConfirm school-fee assessment rules750 SFState impact-fee protection checkpoint1,000 SFTwo-bedroom state minimum allowance1,200 SFCommon local upper-range checkpoint
03 / Site conditionsProperty conditions can change the path.
- Local Coastal Program consistency and whether a Coastal Development Permit is required
- Zoning and lot configuration
- Existing dwelling and utility records
- Parking and access
04 / Consultant screenLikely disciplines to evaluate.
- Structural engineering
- Title 24 energy documentation
- Survey
- Coastal consultation where the Local Coastal Program applies
Consultants are retained only when required by the property, design, or reviewing agency. Their proposals and coordination are separate from the architectural production fee unless stated otherwise in the agreement.
05 / Property-specific next stepTurn the guide into a preliminary project report.
Enter the address to screen jurisdiction, mapped constraints, likely agencies, drawing requirements, consultants, and the preliminary fee path.
Important: This guide is general planning information, not a zoning determination, permit approval, fee quote, or guarantee of feasibility. Current parcel records, adopted codes, agency interpretations, utility requirements, site investigation, and written agency confirmation control.